Difference between revisions of "Perfect Project in Self-Organization and Smart Grids"
(Created page with "Need for * simulation tools * toolbox or execution platform") |
|||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
* simulation tools | * simulation tools | ||
* toolbox or execution platform | * toolbox or execution platform | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | |||
+ | [[Presentation from group two.]]; | ||
+ | |||
+ | Members: Alexander Gogolev, Anna Kosek, Atiyah Elsheikh, Felix Iglesias, Martina Umlauft, Manfred Pöchacker | ||
+ | |||
+ | The project based on following structure: | ||
+ | |||
+ | 1) Area: | ||
+ | |||
+ | 2) Scope: within the Area and geographical | ||
+ | |||
+ | 3) What type of Outcome should be produced: product, algorithm, models, recommendation, demo case (= proof of concept) | ||
+ | |||
+ | 4) Duration | ||
+ | |||
+ | 5) Group size & consitency | ||
+ | |||
+ | |||
+ | We propse following points: | ||
+ | |||
+ | -) The project should be stated in Europe. | ||
+ | |||
+ | -) It should be financed for at least 4 to 5 years. | ||
+ | |||
+ | -) The project structure (team and partners): | ||
+ | Interdisciplinary team from related fields; | ||
+ | 12 to 15 people work in 3-5 clusters; | ||
+ | '''Partners are from industry and power suppliers;''' | ||
+ | |||
+ | -) The topic(s) are out of: | ||
+ | End-user behavior; Renewables; Reliability; Distributed self-organized managment theory | ||
+ | |||
+ | -) The coutcome should produce: theoretical insight, models, algorithms, recommendations or demos |
Latest revision as of 17:09, 11 July 2012
Need for
- simulation tools
- toolbox or execution platform
Members: Alexander Gogolev, Anna Kosek, Atiyah Elsheikh, Felix Iglesias, Martina Umlauft, Manfred Pöchacker
The project based on following structure:
1) Area:
2) Scope: within the Area and geographical
3) What type of Outcome should be produced: product, algorithm, models, recommendation, demo case (= proof of concept)
4) Duration
5) Group size & consitency
We propse following points:
-) The project should be stated in Europe.
-) It should be financed for at least 4 to 5 years.
-) The project structure (team and partners): Interdisciplinary team from related fields; 12 to 15 people work in 3-5 clusters; Partners are from industry and power suppliers;
-) The topic(s) are out of: End-user behavior; Renewables; Reliability; Distributed self-organized managment theory
-) The coutcome should produce: theoretical insight, models, algorithms, recommendations or demos